4. Installation and Operation
4.1 Package List
Item
1
P-Combiner box (400*385*200, mm)
2
Power connector H4SFC8DM
3
Power connector H4SMC8DM
4
Expansion bolt (M8*60)
5
Power cable 4AWG*2m, SC25-8, orange
6
Power cable 4AWG*2m, SC25-8, black
7
Power cable 6AWG*2m, SC16-8, orange
8
Power cable 6AWG*2m, SC16-8, black
9
Grounding cable 10AWG*1m, yellow-green
10
Power terminal protection cover(set)
11
Wall mounting bracket (372.6*121*20, mm)
12
Fixing screws(M4*15)
4.2 Installation
1. Positioning of
expansion bolt: total 4
holes
2. Install wall mounting
bracket
Torque: 12-13 N.m
Tool: Socket Wrench
Fastener: 4 pcs, M8*60
expansion bolt
3. Hang on combiner box
Description
Vertical:70mm
Horizontal: 302mm
Screw 4 holes for M8*60 expansion bolt and install the
wall mounting bracket
Hanging the combiner box onto the wall mounting
HV-3
HV-6
1
1
3
6
3
6
4
4
-
1
-
1
1
-
1
-
1
1
3
6
1
1
4
4