POOL MAINTENANCE & DRAINAGE ( continued )
14. Fold the liner horizontally in half (see
sections, then place the second rolling pipe on top of the folded liner (see drawings
Make sure the two rolling pipes cover the clear view panel and do not exceed the liner top edge.
15. Begin rolling the liner from the end with the 2 rolling pipes to the other side gently (see
Do not compact the liner. Make sure the clear view panel is facing up during storage.
16. Fold the rolled up liner in half twice (see drawings
17. Store the liner and accessories in a dry, temperature controlled, between 32 degrees Fahrenheit
(0 degrees Celsius) and 104 degrees Fahrenheit (40 degrees Celsius), storage location.
18. The original packing can be used for storage (see drawings
SAVE THESE INSTRUCTIONS
(117IO) CLEARVIEW PRISM FRAME™ PREMIUM POOL ENGLISH 7.5" X 10.3" PANTONE 295U 12/14/2020
drawing
10.1). Insert one rolling pipe (11) between the folded
11.2, 11.3 &
10.1
11.1
11.4
10.2 &
drawing
11.4).
12 &
13).
10.2
11.2
12
English
117A
10.3).
11.1).
10.3
11.3
13
Page 13