6.6 Ready to Start
Checklist
Before starting the inverter, please check the following items:
Item
Mounting
AC
RS485
RJ45
Ripple Control
Receiver
Front Cover
DC
Changing Grid Connection and Operation Parameters
If you need to change grid connection settings and/or operation parameters
including voltages, frequency range, power factor and power limitation, please
contact your local authorized service provider for an "USB key" to do so.
Check Points
Inverter is firmly mounted on
bracket(s)
The 2 lock caps are secured
Locks are closed
All cables are firmly fixed on
terminal block
Polarities are matched
Protective Ground is available
Cable gland is tightened firmly
All terminals are secured
Polarities are matched
Wires are tightened by cable gland
If not used, sealing plugs are in
position
Front cover is firmly attached
All screws are secured
All plugs are firmly connected
Polarities are matched
Strings are not mixed wired (for
multiple MPPT models)
29
Checked?