Kohler POPLIN K-75881T Installation Instructions Manual
Kohler POPLIN K-75881T Installation Instructions Manual

Kohler POPLIN K-75881T Installation Instructions Manual

Advertisement

BEFORE YOU BEGIN

BEFORE YOU BEGIN
·
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
·
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler China. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
These instructions contain important care, cleaning, and
warranty information-
please leave instructions for the
consumer.
·
POPLIN
bathroom cabinet adopts
E1 grade birch
wood-based panel
further processing, its harmful emissions will be less than
1.5mg/L.
·
Turn off the water supply.
·
The pluming installation must comply with Water Supply
Regulations/Bye-laws, Building Regulations or any
particular regulations and practices, specified by the local
water company or water undertakers. The installation
should be carried out by a plumber.
·
Before installation carefully inspect the new fixture for any
signs of damage.
·
This product complies with GB 24977-2010.

ORDERING INFORMATION

This installation covers the following products in the POPLIN
range:
POPLIN Cabinet 914mm....................................K-75881T
POPLIN Cabinet 1220mm..................................K-75854T

SAFETY WARNINGS

Kohler products are precision-engineered and should give
continued superior and safe performance, provided:
1. They are installed, commissioned, operated and
maintained in accordance with the recommendations given
in this Manual.
2. Periodic attention is given, as necessary, to maintain the
product in good functional order. Recommended
guidelines are given in the
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for
power tool safety should be followed.
KOHLER CHINA INVESTMENT CO., LTD
1261214-T01-B
natural birch wood and
of high quality, and with
MAINTENANCE
section.
JING'AN DISTRICT, SHANGHAI, PRC
(
)
·
·
·
·
·
·
·
·
GB 24977-2010
1.
2.
NO.158, JIANG CHANG SAN ROAD,
POST CODE: 200436
158
©
Copyright Kohler China Investment Co., Ltd. 2017
-1-
©
POPLIN
Installation INSTRUCTIONS
CABINET
K-75881T/K-75854T
E1
1.5mg/L
200436
-
2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POPLIN K-75881T and is the answer not in the manual?

Questions and answers

Summary of Contents for Kohler POPLIN K-75881T

  • Page 1 · · All information in these instructions is based upon the latest product information available at the time of publication. Kohler China. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. ·...
  • Page 2 ROUGHING-IN Reference Value UNIT : mm 1220 Fig.1 Kohler reserves the right to change marked dimensions without prior notice. INSTALLATION A. Install Washbasin Cabinet Install the services. Hot (H) and Cold (C) inlets must be connected to the correct inlet pipes.
  • Page 3 1. Place the cabinet on the floor. Fix adjustable feet as shown in Fig.3. (Put carton or foam on the floor first to prevent scratching the cabinet.) Fig.3 2. Put the cabinet upright and place it at a desired position in the bathroom.
  • Page 4 4. Adjust position of the adjustable shelf as shown in Fig.6. Loosen the clip. Lift the shelf to remove it. Adjust position of the shelf support. Tighten the clip. Press down the shelf. Fig.6 5. Adjust the hinge cover in 3 direction to make sure the door is level.
  • Page 5 Connect Drainage 1. Inwall drainage (P-Trap) Please install the drain assembly and faucet as shown. Please set the water supply and drainage position according to the suppliers instructions. You can put the pipe into the U notch. Faucet Supply Lines Shut-off Valve Drain Assembly Fig.8...
  • Page 6 6. Please do not sit, lean or step on the basin cabinet. 7. If any fixtures caused by abnormal reasons, Kohler China can supply paid replacement for service parts caused by abnormal reasons as shown in the Service Parts Page in the limited duration of warranty.

This manual is also suitable for:

Poplin k-75854t

Table of Contents