ECR International Utica Boilers MAH-125 Installation, Operation And Maintenance Manual page 75

Condensing wall mounted gas fired boiler
Table of Contents

Advertisement

LABOR SAVING PIPING MANIFOLDS / NEAR BOILER PIPING CONNECTIONS
150 COMBI
MANIFOLD
150/205
H
B
A
I
LEGEND
A
Pressure Gauge
B
Pressure Relief Valve
C
Heating return connection
D
Cold DHW inlet tap
E
Gas shutoff connection
F
Boiler filling connection (some models)
G
DHW outlet
H
Drain connection for condensate
I
Heating supply connection
5 gpm DHW flow restrictor
K
(Factory installed) (205 only)
5
205 COMBI
K
G
D
E
150
-
30.00 psi [2.11 bar]
3/4" [22.2mm] 1" [25.4mm]
1/2"
[15.9mm]
3/4" [22.2mm]
1/2"
[15.9mm]
1/2"
[15.9mm]
13/16" [21mm]
ID Hose
3/4" [22.2mm] 1" [25.4mm]
na
PN 240011430 REV. M [06/30/2019]
C
205
3/4" NPT
na
3/4" NPT
3/4 NPT
3/4"
[22.2mm]

Advertisement

Table of Contents
loading

Table of Contents