SPECIFICATIONS

ZX250LC-3, 250LCN-3 2-piece Boom

A
G
D
K
I
Model
Type of Front-End Attachment
Bucket Capacity (Heaped)
Operating Weight
Base Machine Weight
Engine
A: Overall Width
(Excluding back mirrors)
B: Cab Height
C Rear End Swing Radius
D: Minimum Ground Clearance
E: Counterweight Clearance
F: Engine Cover Height
G: Overall Width of Upperstructure
H: Undercarriage Length
I: Undercarriage Width
J: Sprocket Center to Idler Center
K: Track Shoe Width
Ground Pressure
Swing Speed
Travel Speed (fast/slow)
Gradeability
NOTE: * The dimensions do not include the height of the shoe lug.
OPTIONAL ATTACHMENTS AND DEVICES
B
ZX250LC-3 2-piece Boom
25600 kg (56400 lb)
19600 kg (43200 lb)
Isuzu AH-4HK1XYSA-01 132 kW/2000 min
3190 mm (10 ft 6 in)
3190 mm (10 ft 6 in)
J
H
2.19 m (9 ft 9 in) Arm
3
PCSA 1.0 m
(1.3 yd
3010 mm (9 ft 11 in)
2940 mm (9 ft 8 in)
*460 mm (18 in)
* 1090 mm (3 ft 7 in)
* 2425 mm (8 ft)
2890 mm (9 ft 6 in)
4640 mm (15 ft 3 in)
3845 mm (12 ft 7 in)
600 mm (24 in) (Grouser shoe)
51 kPa (0.52 kgf/cm
13.5 min
5.5/3.4 km/h (3.4/2.1 mph)
35° (tan θ = 0.70)
13-37
C
ZX250LCN-3 2-piece Boom
3
3
), CECE 0.9 m
25500 kg (56200 lb)
19500 kg (43000 lb)
–1
(180 PS/2000 rpm)
2990 mm (9 ft 10 in)
2990 mm (9 ft 10 in)
2
, 7.4 psi)
–1
(rpm)
F
E
M1V1-12-001