Figure3-2 Installation environment requirements
⚫ As the operation of inverter will produce noise pollution, avoid installing them near residential
areas as far as possible.
Choosing the best installation location for the inverter, which plays a very important role in its safe
operation, service life, performance guarantee, etc. Therefore, it is recommended to choose a place that
can avoid direct sunlight, rain, and snow, as shown in Figure3-3.
Figure3-3 Recommended installation location

3.3.2 Installation Clearance

⚫ Keep a clearance of at least 800mm from the left side and right side of the inverter to other objects,
keep at least 600mm from the top of the inverter to ceiling and at least 450mm from the bottom of
the inverter to ground, which is good for heat dissipation or maintenance, as shown in Figure3-4.
IV438E REV.01 Issued: 2022/11/09
User Manual Soleil SRT/SPX 75K-150K
Pag. 25 of 74 +FR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spx 136kSpx 150kSrt80kSrt90kSrt100kSrt110k ... Show all

Table of Contents