1.1.8 Measurement Under Operation

High voltage is present in the device even when not in operation. Touching device accidently, may
cause electric shock. So, in case some measurements have to be performed under operation,
protection measures have to be taken (such as wear insulated gloves, etc.).
The measuring device must meet the following requirements:
The range and operation requirements of measuring device meets the site requirements.
The connections for measuring device should be correct and standard to avoid arcing.

1.2 Operator Requirements

The operation and wiring for inverter should be performed by qualified person, which is to ensure
that the electrical connection meets the related standards.
The professional technicians must meet the following requirements:
Be trained strictly and understand all safety announcements and master correct operations.
Fully familiar with the structure and working principle of the whole PV grid-tied generation
system.
Know well about the related standards of local Country and District.
IV438E REV.01 Issued: 2022/11/09
User Manual Soleil SRT/SPX 75K-150K
Pag. 12 of 74 +FR