To Connect The Backup Heater To The Main Unit - Daikin ETSHB16P50EF Installation Manual

Hide thumbs Also See for ETSHB16P50EF:
Table of Contents

Advertisement

X6M
SWB2
*3V (3V: 1N~ 230 V)
*6V (6V: 1N~ 230 V)
*9W (3N~ 400 V)
Model (power
Connections to backup heater power
supply)
X6M
*3V (3V: 1N~ 230 V)
SWB2
F1B
20A
Q1DI
1N~, 50 Hz
230 V AC
ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679468-1A – 2022.07
X6M
SWB2
F1B
1
3
20A
I
I
2
4
Q1DI
1N~, 50 Hz
L
N
230 V AC
supply
1
3
I
I
2
4
L
N
Model (power
Connections to backup heater power
supply)
X6M
*6V (6V: 1N~ 230 V)
SWB2
F1B
32A
Q1DI
1N~, 50 Hz
230 V AC
X6M
*9W (3N~ 400 V)
SWB2
F1B
20A
Q1DI
3N~, 50 Hz
400 V AC
F1B 
Overcurrent fuse (field supply). Recommended fuse:
tripping class C.
Q1DI
Earth leakage circuit breaker (field supply)
SWB
Switch box
X6M
Terminal (field supply)
6.3.4
To connect the backup heater to the main
unit
Wires: The connection cables are already connected to the
option backup heater EKECBU*.
[9.3] Backup heater
1 Open the following (see
"4.2.1 To open the indoor
1 User interface panel
2 Switch box
3 Switch box cover
4 Top cover
2 Connect both connection cables from the backup heater
EKECBU* to the appropriate connectors as shown in the
illustration below.
6 Electrical installation
supply
1
3
I
I
2
4
L
N
1
3
5
I
I
I
2
4
6
L1
L2
L3
N
unit" [ 4  7]):
Installation manual
4
3
2
1
19

Advertisement

Table of Contents
loading

Table of Contents