Prepare Boiler; Remove Boiler From Wood Pallet; Gas Conversions - Lochinvar 101 Series Installation & Service Manual

Fire tube boiler and combi
Table of Contents

Advertisement

2

Prepare boiler

Remove boiler from wood pallet

1. After removing the outer shipping carton from the
boiler, remove the parts box.
Wall Mount
2. To remove the boiler from the pallet:
a.
Remove the two (2) lag bolts securing the
bottom of the unit to the pallet.
b.
Lift the boiler off the wall bracket mounted to
the pallet (FIG. 2-1).
3. Remove the two (2) lag bolts securing the wall bracket to the
wood pallet. Be certain not to lose the wall bracket as it will
be needed for securing the boiler to the wall (FIG. 2-4).
Floor Standing
2. Remove the front door to access the lag bolts in front of
the unit (FIG. 2-1).
3. To remove the boiler from the pallet (after removing the
front door):
a.
Remove the two lag bolts from the wood pallet inside
the boiler (FIG. 2-1).
b.
Detach the boiler from the lag bolts in the rear of the
unit, see FIG 2-1.
Do not drop the boiler or bump the jacket
NOTICE
on the floor or pallet. Damage to the boiler
can result.
Do not attempt to use the water pipe
CAUTION
fittings or gas pipe to lift the boiler.
Do not attempt to lift the boiler using the
CAUTION
gas pipe as a handle.
Figure 2-1 Boiler Mounted on Shipping Pallet
Wall hung
Floor standing
FRONT
(QTY. 2)
2000620208 00
REMOVE SHIPPING
(WALL) BRACKET
DO NOT DISCARD.
WILL BE NEEDED TO
SECURE THE BOILER
TO THE WALL.
DIR #2000528206 00
BACK
LAG
BOLTS
LAG
BOLTS
(QTY. 2)
2000620208 00
Installation & Service Manual
F I R E T U B E

Gas conversions

For a boiler already installed, you must
⚠WARNING
turn off gas supply, turn off power and
allow boiler to cool before proceeding.
You must also completely test the boiler after conversion to
verify performance as described under Start-up, Section 10
of this manual.
Failure to comply could result in severe personal injury,
death, or substantial property damage.
You must install a propane venturi to operate the Noble Fire
Tube on propane gas. Verify when installing that the venturi
label marking matches the boiler size. Refer to the Replacement
Parts List for the appropriate LP Conversion Kit applicable to
your unit's size and serial number.
1. If boiler is already installed, you must turn off the gas
supply, turn off the power, and allow the boiler to cool
before proceeding.
2. Remove the front access cover from the unit (no tools
required for removal).
3. Using a 5/16" nut driver, loosen the rachet clamp securing
the air intake fitting to the venturi assembly. Slide the
rubber boot off the venturi.
4. Using an adjustable wrench, loosen the union between the
gas valve adapter and the venturi assembly. Remove the
gasket between the gas piping and venturi (FIG. 2-2).
5. Using a 3 mm Allen wrench, remove the three (3) screws
securing the venturi to the fan assembly and proceed to
remove the natural gas venturi from the unit, making sure
not to damage the blower O-ring gasket (FIG. 2-2).
6. Install the air shutter.
a.
Disconnect the wiring from the fan and remove the
bolts securing the fan to the heat exchanger top plate.
b.
Remove the fan and gasket, and install the air shutter
provided in the kit. Note: On NKC/NCF110 models, the
air shutter MUST be installed in the proper direction.
Install the air shutter so that the hole in the corner is
oriented towards the back right corner of the unit
(opposite the front door and gas piping).
c.
Replace all torn or damaged gaskets. Reassemble the
fan assembly and reconnect the wiring harnesses
before operation.
7. Install the propane venturi and verify the following:
a.
The UP arrow on the plastic housing is pointing
upward.
b.
The threaded connection for the gas piping is facing
towards the LEFT of the unit.
8. Reassemble the unit by following the previous steps in
reverse order, taking care to ensure that the venturi adapter
gasket is seated properly before tightening the nut on the
venturi. NOTE: Replace any torn or damaged gasket(s) that
may have been damaged or torn during installation.
9. After installation is complete, fill out the gas conversion
label (in the conversion kit bag) and affix it to the unit to the
right of the control display as shown in FIG. 2-3.
10. Replace the front access cover removed in Step 2 and
resume operation.
When removing the natural gas venturi,
⚠ DANGER
inspect the gasket at the gas connection
and the O-ring at the blower. These gaskets must be in good
condition and must be installed. Failure to comply will cause a
gas leak, resulting in severe personal injury or death.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

100 series110 series111 seriesNkb80nNcf110nNkb110n ... Show all

Table of Contents