Download Print this page

Alto-Shaam Prodigi 6-10E Installation Manual page 22

Pro control and classic control

Advertisement

I
NSTALLATION
Electrical Kit Installation—60 Hz
Applications
for the
Americas
1
A
Remove enough cable covering so that wires reach the
2
terminal blocks. Depending on the application, install the
straight or the elbow fitting on to the cable.
Cut threads into nut before installing fitting.To do so,
apply a light lubricant and thread nut on and off fitting.
2*
B
1
* For 3-phase appliances remove white wire.
* For 1-phase appliances remove red wire and orange wire.
Cut threads into nut before installing fitting.To do so,
apply a light lubricant and thread nut on and off fitting.
B
2
2*
* For 3-phase appliances remove white wire.
* For 1-phase appliances remove red wire and orange wire.
22
B
B
Appliance side
1
2
A
Power supply side
3
1
2
3
1
3
4
5
4
1
3
4
5
5
Note: Cabling and connectors must be
supplied for 120V configurations.
Install the fitting/wiring to the oven.
Match the cable bushing to the correct
sized knockout. Remove the knockout.
Bottom panel
installation point.
Route the wires. Keep wires away from hot surfaces such as water tank,
drain pipe, motor, edges of sheet metal, vent pipes, or other appliances.
Connect the wires to the appropriate terminals (L1, L2, L3, etc.) in accordance
with local codes and regulations. Install the ground wire to the ground terminal.
P ro di gi ™
In s t a l l a t i on M a nu a l
CT-TS-016428
MN-4810 9
Rev 2
6 /23

Advertisement

loading