Mitsubishi Electric CITY MULTI PLFY-P NAMU-E Series Installation Manual page 10

Air-conditioners for building application indoor unit

Advertisement

7. Test run
A
D
E
Fig. 7-2
8. Installing the grille
1
2
4
Fig. 8-1
B
C
Fig. 8-2
A
B
1
1
C
Fig. 8-3
G
F
F
Fig. 8-4
10
B
A Insert the pump end 1-3/16 to 2 in.
C
B Cover of water supply inlet
C About 1/4 gal
D Water
E Drain plug
3
5
A
D
E
2
D
B
1
7.3. Check of drainage (Fig. 7-2)
• During the test run, ensure the water is being properly drained out and that no
water is leaking from joints.
• Always check this during installation even if the unit is not required to provide cool-
ing/drying at that time.
• Similarly, check the drainage before finishing ceiling installation in a new premises.
(1) Remove the cover of the water supply inlet and add about 1/4 gal (1000 cc) of
water using a water supply pump etc. During this process, be careful not to spray
water into the drain pump mechanism.
(2) Confirm that water is being drained out through the drainage outlet, after switch-
ing over from remote control mode to test run mode.
(3) After checking the drainage, ensure that the cover is replaced and the power
supply is isolated.
(4) After confirming the drainage system is functioning, replace the drain plug.
8.1. Checking the contents (Fig. 8-1)
• This kit contains this manual and the following parts.
Accessory name
Q'ty
1
Grille
2
Screw with captive washer
3
Gauge
4
Fastener
5
Screw
8.2. Preparing to attach the grille (Fig. 8-2)
• With the gauge 3 supplied with this kit, adjust and check the positioning of the unit
relative to the ceiling. If the unit is not properly positioned relative to the ceiling, it
may allow air leaks or cause condensation to collect.
• Make sure that the opening in the ceiling is within the following tolerances:
33-7/8 × 33-7/8 to 35-13/16 × 35-13/16 in. (860 × 860 to 910 × 910 mm)
• Make sure that step A is performed within 17-22 mm. Damage could result by fail-
ing to adhere to this range.
A Main unit
B Ceiling
C Gauge 3 (inserted into the unit)
D Ceiling opening dimensions
8.2.1. Removing the intake grille (Fig. 8-3)
• Slide the levers in the direction indicated by the arrow 1 to open the intake grille.
• Unlatch the hook that secures the grille.
* Do not unlatch the hook for the intake grille.
• With the intake grille in the "open" position, remove the hinge of the intake grille
from the grille as indicated by the arrow 2.
8.2.2. Removing the corner panel (Fig. 8-4)
• Remove the screw from the corner of the corner panel. Slide the corner panel as
indicated by the arrow 1 to remove the corner panel.
A Intake grille
B Grille
C Intake grille levers
D Grille hook
Remark
37-3/8 (950) × 37-3/8 (950)
1
M5 × 0.8 × 25
4
1
(Divided into four parts)
2
4 × 8
4
E Hole for the grille's hook
F Corner panel
G Screw