Verifying Your Connection; Finishing Up - Fluke 1750/ET Operator's Manual

Power recorder
Table of Contents

Advertisement

If your power connections require potential transformers (PTs) or current
transformers (CTs), you can use the ratio settings in Power View to set the
Recorder to display readings as they exist on the primary side of the PT and
CT (for example, 12000 V).
3. Connect the Recorder to the wiring by first connecting the measurement ground test
lead to the distribution system ground, and then the neutral probe to neutral.
4. Connect the ground current probe to the distribution system ground and the neutral
current probe to neutral, with the arrow on the current probe pointing towards the
load (away from the source) in each case.
5. Connect the remaining current probes to the power network.
The arrow on the current probe should point toward the load.
Use the color-coding on the leads to help you connect the probes to the correct
phases, neutral and ground.
6. Connect the remaining voltage probes.
Make sure the voltage probes and current probes are paired correctly,
Phase A (L1) voltage to Phase A (L1) current and so forth. Calculations are
made in pairs and cannot be changed after data is recorded. The leads for
the voltage probe and current probe of the same color should be attached
to the same phase wire or busbar.
7. Check the LED for each phase to make sure a connection is established.
When a phase LED is ON or lighted, you know that the connection is active and
that voltage and current is within the normal range.
When a phase LED is BLINKING, you are connected but the voltage or current
is exceeding the normal range or exceeding the range of the probe that you are
using.
When a current LED is OFF or unlit, there is insufficient current present in the
line.

Verifying Your Connection

Before you leave the Recorder to accumulate data at the facility, double-check the
connections.
Make sure the current probes are secured and completely closed around the
conductors and that the voltage and current LEDs are steady-on.
Use the PHASOR screen on the PDA or PC to verify that the voltage and current
connections are correct. You can swap the connections using Power View if they are
incorrect.

Finishing Up

After making any corrections to the connections, recheck the PHASOR diagrams to
confirm your connection. Make sure the nominal voltage, nominal line frequency, and
power type (delta, wye, other) are correct before you leave the Recorder. It is a good
practice to insert a Start Mark when you are finished with all settings so you can
download data and ignore useless readings and events common at the beginning probe
connecting activities. You can also use the "Erase Memory" function and measurement
Installing the Power Recorder at a Facility
Note
Note
Power Recorder
13