AND PT Series Instruction Manual page 9

Pipette accuracy tester
Table of Contents

Advertisement

4. Install the lower part of the evaporation trap on the
weighing unit, mating the tabs with the holes on the
base.
5. Attach the upper part of the evaporation trap to the
lower part, mating the tab with the notch.
6. Adjust the direction of the evaporation trap so that the pipette insertion opening on the sloped
surface is faced to allow easy operation.
Pipette
insertion
opening
7. Install cap B on the evaporation trap.
Remove cap A from the sloped surface.
Facing to the right
of the weighing unit
 
Upper part of
the evaporation trap
7
Lower part of
the evaporation trap
Tab
Hole
Upper part of
the evaporation trap
Tab
Lower part of
the evaporation trap
Notch
Facing to the left
of the weighing unit
 
Cap B
Pipette
insertion
opening
Cap A

Advertisement

Table of Contents
loading

Related Products for AND PT Series

This manual is also suitable for:

Ad-4212b-ptAd-4212a-ptFx-300i-pt

Table of Contents