Maintenance
Cubicle MOC Forces
Reference Table 2 for the nominal and maximum forces
required to operate the cubicle MOC's. The force measure-
ment is made by operating the cubicle pantograph. The
force is measured when operating the pantograph at the
location corresponding to the MOC actuator pin interface
with the pantograph when the circuit breaker is in the
Connect position.
Table 2 — Cubicle MOC Forces
1 Tier
2 Tier
3 Tier
Pantograph Setup
Reference Figure 7 for the setup of the cubicle pantograph.
This figure matches the original equipment manufacturer's
setup.
The cubicle maintenance details for the Cubicle MOC
forces and the Pantograph setup are provided for refer-
ence only.
MOC operator force
20 +/- 5 lbs
40 +/- 5 lbs
60 +/- 5 lbs