Tools Required; Step 1 - Mount The System - ABB NES4812-23-AC1-PS4-DC1E-LVBD Quick Start Manual

Table of Contents

Advertisement

QUICK START GUIDE

Tools required:

Cable Crimpers
Screw Drivers
Step 1 – Mount the System
Mount the system with a minimum gap of 3 inches behind the system to allow proper airflow.
1. Attach the system to the frame using a minimum of twelve (six on each side) 12-24 screws (provided).
Torque to 35 in-lb (7.3 Nm) - 5/16" socket.
Step 2 – Connect Chassis and DC Reference (CO) Ground
Chassis Ground lug - #10 or 1/4" on 5/8" centers (not provided).
Minimum 10 AWG recommended.
Torque to 10-32 screws to 30 in-lb (3.4 Nm) – 5/16" Socket.
DC reference ground lug - 5/16" or 3/8" on 1" centers (not provided).
Torque to 160 in-lb.
Note: If connecting chassis ground to frame surface remove non-conductive frame coating and apply
antioxidant for connection.
Page 4
© 2021 ABB. All rights reserved.
Torque wrench (0-240 in-lb / 28 Nm)
Screw Drivers (#1 Flat & #2 Phillips)
Infinity S_Dual V_old_QSG
5/16," 7/16" and 1/2" nut drivers
Wire cutters and strippers
Version 4.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

8600243957p

Table of Contents