Turning On Your Dlt7 Autoloader For The First Time; Figure 4-1: Attach Scsi And Power Cable To Your Autoloader - Quantum DLT 1 Operation Manual

Tape drive autoloader
Hide thumbs Also See for DLT 1:
Table of Contents

Advertisement

5. Secure the SCSI cable connectors by tightening the finger-screws until snug or by
snapping the wire bales into place.

Figure 4-1: Attach SCSI and Power Cable to your Autoloader

4.2.5

Turning on Your DLT7 Autoloader for the First Time

1. Remove the front door keys, which are taped to the rear panel. Then unlock and open
the front door.
2. Remove the foam shipping block from the cartridge storage area.
3. Attach the female connector on the power cable to the power connector on the rear
panel of the autoloader.
4. Plug in the power cable to the nearest grounded power outlet.
Use caution when plugging the power cord into an electrical outlet. Hazardous voltages
are present in the sockets of the outlet.
5. Plug in the host server or workstation and all attached devices.
6. Turn on your DLT7 Autoloader. Check the LCD panel to make sure the autoloader is
receiving power. If it is not, check the power connections and your power source.
7. Turn on the host server or workstation and allow its operating system to start. If you
have not already installed your backup application, do so now.
While your DLT7 Autoloader initializes, LdR INIT and the Activity Bars appear on the LCD
panel and the Activity LED blinks slowly.
BENCHMARK
T A P E
S Y S T E M S
SCSI Terminator
SCSI Cable
Preliminary
September 21, 1999
4-8

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLT 1 and is the answer not in the manual?

Table of Contents