GE Fuji Electric FVR-C9S-2UX Series Instruction Manual page 15

Three-phase 230 v ac input type
Table of Contents

Advertisement

8.
8.
8.
4) Arrange the main circuit and the control
circuit wiring as follows.
CN 1
CN 2
E(C) L1 L2 L3 U V W
Earth
3-Phase
Power
M
Supply
1. Motor coast-to-stop
2. Reset signal
3. Reverse-direction operation command
4. Forward-direction operation command
5. External alarm
6. Frequency setting VR
7. Combined alarm relay output
Note 1) FWD and THR are connected to CM
at the factory. In this condition,
starting/stopping can be performed
via RUN/STOP keys on the keypad
panel.
Note 2) In case of using an external potenti
ometer, remove the connector by
which the keypad panel and the
CN2 on the drive main unit are
connected.
14
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Disconnect
CN 1
CN 2
CRG Lamp
1
2
3
R
R
R
X
S
E
T
Y
6
Note 2
motor
1
1
1
1
2
3
FVR-C9S-2UX
5) Reinstall the cover. Connect the harness
of the keypad panel to the CN2 on the main
unit, then reinstall the keypad panel fitting it
onto the guide pins.
8.
8.
8.
6) As shown below, reinstall the cover onto
4
5
the drive main unit, and fix it with the mount-
Note 1
ing screw.
x
F
T
C
W
M
M
2
D
R
7
3
3
3
0
0
0
B
C
A
Connect
CN 1
CN 2
Side view of inverter
Guide Pin
CN 2
1

Advertisement

Table of Contents
loading

Table of Contents