Wiring Diagram - Amana MVC96 BB Series Installation Instructions Manual

Two-stage gas furnace
Hide thumbs Also See for MVC96 BB Series:
Table of Contents

Advertisement

WIRING DIAGRAM

YL
BR
PU
OR
GY
WH
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
ID BLOWER TWO-STAGE PRESSURE
SWITCH ASSEMBLY
HOT
SURFACE
IGNITER
OR
LOW FIRE
C
NO
PRESSURE
SWITCH
OR
HI
PU
C
BR
GY
PM
TWO STAGE
GAS VALVE
(WHITE-RODGERS)
PRESSURE SWITCH
MANUAL RESET ROLLOUT LIMIT
CONTROLS (SINGLE CONTROL ON
40 kBTU)
BL
PK
BL
AUTO RESET PRIMARY
LIMIT CONTROL
PU
INDUCED
WH
RD
BLOWER
BK
GND
BURNER COMPARTMENT
BLOWER COMPARTMENT
AUTO RESET
AUXILIARY
LIMIT
CONTROL
RD
4
3
BK
FS
2
GY
BL
1
BL
14
15
GY
13
1
6
11
12
PK
10
7
8
9
GN
4
5
6
2
3
PU
IN
OUT
1
1
1
2
R
PU
PK
YL
BL
GY
BK
RD
BK
WH
GN
PK
GND
WH
GND
YL
BK
HIGH FIRE
PRESSURE
WH
SWITCH
C
NO
OR
PU
FLAME
SENSOR
GY
FRONT COVER
OR
BL
DRAFT
GND
GN
BR
OR
PU
5
IGN-N
IND-N
4
IND-LO
3
IND-HI
2
IGN
1
GY
CENTER
LEFT
RIGHT
24
VAC
115
VAC
RAT
6
NA
GND
GND
SAT
HUM
C
R
C
G
W
Y E
D
WH
WH
BK
BK
BK
50
GND
L
N
GND
HLI (3)
HLI (6)

Advertisement

Table of Contents
loading

Table of Contents