Carrier 130 Series Installation, Start-Up, And Operating Instructions Manual page 9

Upflow/ horizontal variable speed 2-stage, induced-combustion gas furnace
Table of Contents

Advertisement

LINE CONTACT ONLY PERMISSIBLE BETWEEN
LINES FORMED BY INTERSECTIONS OF
THE TOP AND TWO SIDES OF THE FURNACE
JACKET, BUILDING JOISTS,
STUDS, OR FRAMING.
FLUE VENT
6 " M
CLEARANCE
TO COMBUSTIBLE
MATERIALS
Fig. 10—Horizontal Furnace Attic Installation
ANGLE
IRON OR
EQUIVALENT
(B)
(A)
ROD LOCATION
USING DIMPLE
LOCATORS
(SEE DIMENSIONAL
DWG FOR
LOCATIONS)
(A) PREFERRED ROD LOCATION
(B) ALTERNATE ROD LOCATION
Fig. 11—Horizontal Furnace Crawlspace Installation on Hanger Rods
GAS
ENTRY
I N
SHEET
METAL
24"
(B)
(A)
(A)
3
/
-IN. HEX NUT
8
& WASHER (4)
REQD PER ROD
NOTES:
9
MANUAL SHUTOFF
GAS VALVE
30-IN. MIN
WORK AREA
24"
SEDIMENT TRAP
(A)
(B)
(B)
1. A 1 In. clearance minimum between top of
furnace and combustible material.
2. The entire length of furnace must be
supported when furnace is used in horizontal
position.
A95233
3
-IN. ROD
8
A97600