Payne PG80ESAA Installation, Start-Up, Operating And Service And Maintenance Instructions page 21

Single--stage, 4--way multipoise 33--1/3 in. non--condensing gas furnace input capacities 45,000 thru 155,000 btuh
Table of Contents

Advertisement

FIVE WIRE
THREE-WIRE
HEATING-ONLY
BLOWER DOOR SWITCH
BLK
BLK
WHT
WHT
GND
GND
AUXILIARY
115-V FIELD-
J-BOX
SUPPLIED
DISCONNECT
FURNACE
Fig. 25 - - Heating and Cooling Application Wiring Diagram with 1- -Stage Thermostat
Fig. 24 - - Furnace Control
NOTE 2
W
C
R
G
W
C
R
O
N
T
R
G
O
COM
L
NOTE 1
Y
24-V
TERMINAL
BLOCK
NOTES:
1.
Connect Y-terminal in furnace as shown for proper blower operation.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
Representative drawing only, some models may vary.
21
FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-V WIRING
THERMOSTAT
Y
FIELD-SUPPLIED
TERMINALS
DISCONNECT
CONDENSING
UNIT
TWO
WIRE
A190023
208/230- OR
460-V
THREE
PHASE
208/230-V
SINGLE
PHASE
GND
A190079

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg80esla

Table of Contents