Comfort Glow GCH480 User's Manual And Operating Instructions page 6

Propane construction heater
Table of Contents

Advertisement

PROPANE CONSTRUCTION HEATER
~
UNPACKING THE HEATER
1. Remove heater from carton.
2. Remove all protective packaging applied to heater for shipment.
3. Retain carton and packing material until
you
confirm the unit operates and is found
in
good condition.
4. Check heater for any shipping damage. If heater shows any external or internal
damage,
promptly
inform
dealer/distributor
where
you purchased heater.
5. Remove back cover.
6. Locate the four
(4)
casters shipped
with
the unit. There are
two (2)
locking casters and
two
non-locking casters. Also find the four
(4) washers
and
wrench
shipped
with
the casters.
7. Carefully lay the unit on its back.
8. Place
one washer on
each of the threaded portions of the caster.
(see
Figure 1
).
9. Thread the casters into the four threaded holes in the base of the unit by turning them
clockwise .........-.. The
locking
casters should be placed at the front of the unit and the
other two
at the back of the unit.
(See
Figure 1
).
10. Tighten The casters using the
wrench
supplied
with
the casters.
11. lnstall20 lb propane cylinder.
(see
Propane
Supply
section)
12. Install back cover by inserting the mounting tabs
into
the slots on the rear flange of the heater.
1\..
CAUTION: The casters must be installed
onto
the unit before
it
is used. Failure to
install
the
~ casters may result in a fire or explosion causing property damage, personal injury
or
loss of life.
FIGURE 1
WASHER
LOCKING CASTERS
NON-LOCKING CASTERS
WRENCH INCLUDED WITH
CASTERS
2)))
/75
6

Advertisement

Table of Contents
loading

Table of Contents