Decoupling the underfloor junction box/underfloor device
socket
Fig. 20: Decouplingtheunderfloorjunctionbox/underfloordevicesocket
When laying the underfloor sockets in floating screed, heated screeds
or screeds on separating layers, the underfloor sockets must be decou-
pled. This improves noise protection and gives space to possible defor-
mations of the screed.
1. Releasethelocking(setmarkto"0").
2. Turnoutthescrewsorholdthescrewstightly,insertthequickun-
7
lockingaid
andremovethescrews.
3. Insertthe4locksandlockthem.
Optional: Decoupling after the floor covering work
The decoupling of the underfloor junction boxes/underfloor device sock-
ets can optionally take place after the laying of the floor covering.