Mounting the height compensation set
9
Note!
22 | EN
Mounting the height compensation set
In the case of structural changes (relating to the height) and tolerances
after planning of the screed-covered duct system, the height difference
between the underfloor junction box/underfloor device socket and the
top edge of the screed can be compensated for using the height com-
pensation set.
Fig. 20: Liftingtheunderfloorjunctionbox/underfloordevicesocket
1. Adjusttheunderfloorjunctionbox/underfloordevicesocket
heightofapprox.75mm.
1
toa
OBOBettermann