Preparing For Installation - OBO Bettermann EUK VK Series Mounting Instructions

Screed-covered duct system
Table of Contents

Advertisement

Preparations for mounting
5.2
x
CAUTION
ATTENTION
10 | EN

Fig. 3:
Deductiondimensions
Legend
a 
Distancefromsocketcentretosocketcentre
A280
DeductiondimensiontoUGD/UZD250
A380
DeductiondimensiontoUGD/UZD350
AVK
Deductiondimension,connectionshackle
Example
a 
=
2,500mm
A250
=
280mm
A350
=
380mm
AVL
=
8mm
Fig. 4: Formulaforcalculatingthedeductiondimensions

Preparing for installation

Risk of electric shock!
Theductsystemmustbeconnectedinamannerthatisfullyconductive!
Themountingofthescreed-coveredductsystemtakesplaceonthe
rawfloor,astherequiredelectricalconnectionwouldnototherwisebe
guaranteed.
Risk of damage!
Productdamagetotheheight-adjustmentunits!Duringtheconstruction
10
A 380
OBOBettermann

Advertisement

Table of Contents
loading

Table of Contents