Download Print this page

Schulte freedomRail Training Manual page 19

Advertisement

O-Boxes – 4 Styles
• Each is packaged as a complete set with all necessary hardware and
instructions*.
• Each mounts to the Hanging Uprights
• Each is 24" W x 16-1/4" H x 14" D.
• Each requires a phillips #3 screwdriver or power drill.
Big O-Boxes – 4 Styles
Big O-Box w/1 Shelf
• Each is packaged as a complete set with all necessary hardware and
instructions*.
• Each mounts to the Hanging Uprights
• Each is 30" W x 20" H x 16" D.
• Each requires a phillips #3 screwdriver or power drill.
Design Considerations
• If O-Boxes are placed side-by-side, two (2) side-by-side Uprights are
required.
• If the O-Box is placed into a corner, the Hanging Rail needs to be cut to go
up against the wall.
• It is not recommended to use Wall Mounted Uprights because of leveling and
spacing issues.
Installation
• When aligning the O-Box bracket to the Hanging Upright, use the slots on the
inside of the Uprights.
• When installing a stack of O-Boxes, install the bottom O-Box first.
SCHULTE freedomRail Training Manual
Basic Installation
Big O-Box w/ Shoe Cubby
Big O-Box w/2 Drawers
Big O-Box w/3 Drawers
19
Page

Advertisement

loading