Ductwork

Ductwork should be designed and sized according to the
methods in Manual D of the Air Conditioning Contractors of
America (ACCA) or as recommended by any other recognized
authority such as ASHRAE or SMACNA.
Johnson Controls Ducted Systems
8 0 - 5 / 8
( 2 0 5 0 )
2 0
( 5 1 0 )
6
2 0
( 5 1 0 )
( 1 5 0 )
R E T U R N
N O T E : ( X X X ) I N D I C A T E S
D I M E N S I O N S I N
M I L L I M E T E R S
3 0 - 1 / 2
5 0 - 1 / 2
( 7 7 5 )
( 1 2 8 5 )
R E T U R N
7 6 - 5 / 8
( 1 9 4 5 )
F R O N T
9 4
( 2 3 9 0 )
R I G H T
S U P P L Y
I N S U L A T E D D E C K U N D E R
C O M P R E S S O R S E C T I O N
8
1 4
F R O N T
O R
( 2 0 5 )
( 3 5 5 )
2 T Y P
( 5 0 )
2 3
( 5 8 5 )
4
( 1 0 0 )
2 6
( 6 6 0 )
S U P P L Y
6 4 - 1 / 4
( 1 6 3 0 )
A closed return duct system should be used. This will not
preclude use of economizers or outdoor fresh air intake. The
supply and return air duct connections at the unit should be
made with flexible joints to minimize noise.
The supply and return air duct systems should be designed for
the CFM and static pressure requirements of the job. They
5326602-XIM-B-1019
I N S U L A T E D D E C K U N D E R
C O N D E N S E R S E C T I O N
8 0 - 5 / 8
( 2 0 5 0 )
1 0
( 2 5 5 )
5 9 - 1 / 4
( 1 5 0 5 )
R I G H T
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zf120Zf150

Table of Contents