Westerbeke 3.5 MCGA 60 Hz Operator's Manual page 52

Multi -port single–phase marine gasoline generators
Table of Contents

Advertisement

8 Lay-Up and Recommissioning
2.
Remove the raw water pump cover and gasket and discard the old gasket. Install the raw
water pump impeller removed during lay-up (or a replacement, if required).
3.
Install the raw water pump cover with a new cover gasket.
4.
Reinstall the batteries that were removed before the lay-up period, and reconnect the
battery cables.
5.
Clean the terminals, tighten the connections, and verify that the batteries are fully charged.
6.
Remove the spark plugs, wipe clean, rotate the crankshaft two full revolutions, re-gap, and
re-install to proper tightness. Connect the high-tension leads or coil packs onto each spark
plug.
7.
Start the engine and follow the initial startup procedures in 4.10 Checklist: Initial Startup.
46
page
Operator Manual for Gasoline Generators

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3.5 mcga 50 hz

Table of Contents