Eco P storage solution. Series battery. As a result, the Eco P Series batteries can be easily The Eco P Series battery is available in 48V. installed with most inverter and charger combinations, UPS, rectifiers, DC or AC coupled charging devices, 2.
A damaged battery should not be used and should • Adhere to all safety and installations requirements be returned to PowerPlus Energy or disposed of via within this manual. a recycling facility. Leaking electrolyte can cause skin...
Eco P Series can operate with PCE (Power Control installed in. Electronics) that do not require communications to operate. The Eco P Series batteries are self-managed with an internal BMS within each battery to protect it from If you are unsure, please consult your PowerPlus over voltage, under voltage, over temperature and Energy expert or the PowerPlus Energy web page for over current.
635mm D x 434mm W x 88mm H Battery Dimensions Arc Flash Incident Energy IEm in Cal/cm2 (45cm) 0.36 24.45 Arc Flash Incident Energy AFB in cm Pending IEC: 62619:2017, UN38.3, EMC Certifications 10 Years (Conditions apply) Warranty PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 6 of 20...
Float Voltage Standby (Long Term Float) (Example 54.4V to 56V UPS Application) Charge Current 1.02 Peukert Exponent Shutdown SoC Recommended Every 7 days or more frequent where possible. Calibration to 100% (Ensures cell balancing is performed & keeps external SoC counter more accurate) PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 7 of 20...
Page 8
3.4.5. CHARGING CURVES P SERIES 3.4.6. DISCHARGING CURVES P SERIES PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 8 of 20...
Page 9
The integrated non-polarised DC circuit breaker is dual 49.50V pole and a K curve type. The table below outlines the 48.00V trip times based on current. Multiple of circuit breaker rated current PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 9 of 20...
• The area or enclosure is vermin proof to suit your environmental locations. • The batteries and battery cabinets/housings are not exposed to direct sunlight. The Eco P Series battery is designed to be installed in a 19 inch data rack assembly or an electrical enclosure of your choice. If the battery is to be installed outdoors a suitable IP54 or great enclosure should be used.
4.2. BATTERY INSTALLATION 4.2.2. BATTERY ORIENTATION STATIONARY APPLICATION PowerPlus Energy highly recommends our range of Rack or Slimline Series indoor and outdoor cabinets. The Eco batteries can be mounted in 4 orientations, Full specification details are available on the PowerPlus excluding on its face or upside down.
A range of cables and mating connectors and in most installations will not require earthing. are available from any PowerPlus Energy place of However should your application require the case to be purchase. grounded a 5mm M6 bolt should be used.
Temperature Protection Mode [Battery BMS]: BMS has detected cell temperature outside of our operation window of MAX 55°C. Charge or discharge will be disabled until cell temperature reduces. PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 14 of 20...
Flip the switch on circuit breaker to the left LiFe 4833P 63A DC Circuit 63A DC Circuit LED Indicator Light LED Indicator Light Breaker will illuminate when Breaker will turn off circuit breaker is on PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 15 of 20...
Page 16
3. Ascertain from PCE manufacture the accuracy of the SoC calculator. If a higher more accurate shunt can be used with the PCE to monitor system SoC, then this should considered. PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 16 of 20...
3. Turn off battery/s via DC circuit breaker and wait 30 seconds. 4. Turn on battery via DC circuit breaker. 5. Wait for battery Main Status LED to illuminate. 6. Connect and turn on site PCE. PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 17 of 20...
Battery time to discharge under test = 1.85hrs voltage until battery has reached float. = (((78*0.5)*1.85)/78)*100 Ensure all connected PCE has had relevant charge = 92.5% current and battery capacities revised to suit new increased storage solution. It is important to ensure the battery is fully charged before discharging. PowerPlus Energy Pty Ltd 12/05/2023 | V3.6 page 18 of 20...
11. End of Life When a PowerPlus Energy battery is removed from service it can be returned to PowerPlus Energy for recycling. Due to the stability and longevity of LFP cylindrical cells, returned batteries will be refurbished and checked so...
Page 20
PowerPlus Energy Pty Ltd 2 Koornang Road Scoresby, Vic, 3179 Australia +61 3 8797 5557 info@powerplus-energy.com.au powerplus-energy.com.au...
Need help?
Do you have a question about the Eco P Series and is the answer not in the manual?
Questions and answers