HADEF EHH Installation, Operating And Maintenance Instructions For The Installer And The User page 13

Single girder manual overhead travelling crane
Table of Contents

Advertisement

Notes on the repair of faults are found in the following table.
For the repair of failures please contact our service department.
Pos: 18.2.2 /1_HADEF/---ALLGEMEIN/Hinweise/VORSICHT - Störung beseitigen bei Verschleißteilen @ 0\mod_1177594576085_52.docx @ 5572 @ @ 1
CAUTION!
Trouble caused by wear or damage to parts such as wire ropes, chains, chain wheels, axes, bearings,
brake parts, etc., must be remedied by replacing the parts with original spare parts.
Pos: 19.1 /1_HADEF/16-ABHILFE/*Ü1*/#. Kapitel - Abhilfe @ 0\mod_1176707716661_52.docx @ 4300 @ @ 1
15
Remedy
Pos: 19.2.1 /1_HADEF/16-ABHILFE/Krane/02.Tabelle - Krane - E+H+P @ 2\mod_1289230970349_52.docx @ 16702 @ @ 1
Problem
Trolley is hardly to travel
Pos: 20.1 /1_HADEF/17-AUßERBETRIEBNAHME/*Ü1*/#. Kapitel - Außerbetriebnahme @ 0\mod_1172648336045_52.docx @ 417 @ @ 1
16
Decommissioning
Pos: 20.2 /1_HADEF/---ALLGEMEIN/Hinweise/WARNUNG - Außerbetriebnahe: Schäden vermeiden.. @ 0\mod_1177597023398_52.docx @ 5591 @ @ 1
WARNING!
It is essential that the following points are observed in order to prevent damage to the equipment or critical
injury when the device is being decommissioned:
Pos: 20.3 /1_HADEF/17-AUßERBETRIEBNAHME/Allgemein/Alle Außerbetriebnahme @ 0\mod_1173431980767_52.docx @ 671 @ @ 1
It is mandatory that all steps for decommissioning the machine are carried out in the indicated sequence:
First secure the working area for decommissioning, leaving plenty of space.
Read the chapter "Safety instructions".
Disassembly is carried out in reverse order to the assembly.
Please make sure that all operating material is disposed of in accordance with environmental regulations.
16.1
Temporary decommissioning
Measures are as above.
Also read the chapter "Transport and storage".
16.2
Final decommissioning/disposal
Measures are as above.
After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.
Pos: 21.1 /1_HADEF/18-BEISTELLUNG/*Ü1*/#. Kapitel - Beistellung von Unterlagen @ 0\mod_1173713105184_52.docx @ 764 @ @ 1
17
Additional documents
Pos: 21.2 /1_HADEF/18-BEISTELLUNG/Hand/Krane - H @ 2\mod_1289911722318_52.docx @ 16817 @ @ 1
17.1
Operating instructions for cranes
acc. to the accident prevention regulations for "cranes", are attached to the consignment or to the
documents.
=== Ende der Liste für Textmarke Inhalt ===
5.52.705.00.01.02
Cause
Obstacle on the beam
Deformation in the construction
Remedy
Remove the obstacle
Examine the crane, have it repaired by an
authorised workshop if necessary
13

Advertisement

Table of Contents
loading

Table of Contents