Carrier PG96MSA Installation, Start-Up, Operating And Service And Maintenance Instructions page 45

Single-stage, high efficiency, 4-way multipoise 35-in. (889 mm), condensing gas furnace
Table of Contents

Advertisement

PG96MSA: Installation, Start-up, Operating and Service and Maintenance Instructions
Unit
Size
Pipe
Winter
51
Dia. mm
Design
-7
6.1
Temp °C
-18
6.1
-29
4.6
-40
3.0
Unit
Size
Uninsulated
Winter
Pipe
64
76
Design
Dia. mm
Temp °C
-7
3.0
15.2
-18
3.0
6.1
-29
3.0
3.0
-40
3.0
1.5
Installing the Vent Pipe Adapter and Combustion Air
Pipe Adapter
WARNING
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
DO NOT use cement to join polypropylene venting systems. Follow
the polypropylene venting system manufacturer's instructions for
installing polypropylene venting systems.
NOTE: The rubber coupling that attaches to the vent pipe adapter must
be used. The adapter seals the vent pipe to the casing and reduces the
strain on the vent elbow attached to the inducer.
1. Apply the gaskets to the vent pipe and combustion air pipe
adapters. If supplied, remove and discard round center "slug" from
interior of gasket. See
Fig.
Attach gaskets to vent pipe and
combustion air adapters.
Fig. 57 – Vent Coupling and Adapter with Gaskets
NOTE: The vent pipe adapter can be distinguished from the inlet pipe
adapter by the absence of an internal pipe-stopping ring. The vent pipe
can pass through the vent pipe adapter; it cannot pass through the inlet
pipe adapter.
2. Align the screw holes in the plastic vent pipe adapter with the
dimples in the casing.
CAUTION
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal injury or death.
To route the vent pipe and combustion air pipe through the furnace, the
manufacturer supplied kit must be used. Failure to properly seal the
blower compartment from the furnace vestibule could result in the
circulation of carbon monoxide throughout the structure. The vent pipe
and combustion air pipe must be a continuous pipe while passing
through the blower compartment. Seals supplied in this kit must be
installed per the instructions provided. Follow all procedures outlined
in these instructions.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Uninsulated
64
76
102
15.2
12.2
10.7
6.1
4.6
3.0
3.0
1.5
1.5
120,000 BTUh
3/8-in. Insulation
102
64
76
102
12.2
3.0
22.9
28.9
4.6
3.0
16.8
13.7
3.0
10.7
7.6
3.0
7.6
4.6
57.
Vent Coupling and Adapter
100,000 BTUh
3/8-in. Insulation
51
64
76
6.1
24.4
28.9
6.1
16.8
13.7
6.1
10.7
9.1
6.1
7.6
6.1
1/2-in. Insulation
Uninsulated
64
76
102
64
76
3.0
22.9
32.0
1.5
16.7
3.0
19.8
15.2
1.5
7.6
3.0
13.7
9.1
1.5
3.0
3.0
9.1
6.1
1.5
1.5
3. Pilot drill the screw holes for the adapter in the casing and attach
the vent pipe adapter to the furnace with sheet metal screws.
4. Slide the end of the rubber vent coupling with notches in it over the
standoffs on the vent pipe adapter.
5. Insert a length of vent pipe through the coupling into the outlet of
the vent elbow.
6. Tighten the clamp around the outlet of the vent elbow. Torque the
clamp to 15 lb-in.
The following instructions are for PVC/ABS DWV vent piping only.
DO NOT USE THESE TECHNIQUES FOR POLYPROPYLENE
VENT PIPING SYSTEMS. See the polypropylene vent system
manufacturer's instructions for installing polypropylene venting
systems.
Install the remaining vent and combustion air pipes as shown below. It is
recommended that all pipes be cut, prepared, and pre-assembled before
permanently cementing any joint.
1. Working from furnace to outside, cut pipe to required length(s).
2. De-burr inside and outside of pipe.
3. Chamfer outside edge of pipe for better distribution of primer and
cement.
4. Complete the vent and combustion air pipe installation by
A13074
connecting the concentric vent or by installing the required
termination elbows as shown in
For Ventilated Combustion Air Termination, See
5. Clean and dry all surfaces to be joined.
6. Check dry fit of pipe and mark insertion depth on pipe.
7. Insert the vent pipe into the vent elbow.
8. Torque clamp on vent elbow 15 lb-in.
9. Torque clamp on vent coupling 15 lb-in.
10. Insert the combustion air pipe into the adapter.
11. Pilot drill a screw hole through the adapter into the combustion air
pipe and secure the pipe to the adapter with sheet metal screws. DO
NOT DRILL INTO POLYPROPYLENE VENT PIPES. Use an
optional accessory vent coupling, if needed.
12. Seal around the combustion air pipe with silicone or foil tape.
SILICONE SEALERS MAY NOT BE APPROPRIATE FOR
POLYPROPYLENE
POLYPROPYLENE VENT SYSTEM MANUFACTURER'S
INSTRUCTIONS.
13. After pipes have been cut and pre-assembled, apply generous layer
of cement primer to pipe fitting socket and end of pipe to insertion
45
1/2-in. Insulation
102
51
64
24.4
6.1
24.4
10.7
6.1
19.8
6.1
6.1
13.7
3.0
6.1
9.1
140,000 BTUh
3/8-in. Insulation
1/2-in. Insulation
102
64
76
102
15.2
1.5
19.8
32.0
1.5
4.6
1.5
19.8
15.2
1.5
1.5
1.5
13.7
9.1
1.5
1.5
9.1
6.1
1.5
NOTICE
!
Fig.
39,
Fig. 40
VENT
SYSTEMS.
76
102
32.0
27.4
16.7
13.7
10.7
7.6
7.6
4.6
64
76
102
19.8
38.1
19.8
18.3
15.2
12.2
35
7.6
and
Fig.
48.
Fig.
46.
SEE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents