Caster Bar To Top Pivot Assembly; Connecting Actuator; Aerator Heads Assembly - Jrco 753 Operator's Manual

Table of Contents

Advertisement

Refer to Figure 1-4

2.11 Caster Bar to Top Pivot Assembly

1. Center the caster bar over aerator frame and pivot
arms. Use two 3/8-16 x 2 ¾" square u-bolts and 3/8-
16 two-way locknuts to install caster bar.
2. Attach actuator top pivot to caster bar using two 3/8-
16 x 3 ½" hex head bolts, a 3.3" clamp bar and 3/8"
two-way locknuts as show in figure 1-4. Do not
tighten at this time, it will be tightened when aligned
with the actuator.
Refer to Figure 1-5

2.12 Connecting Actuator

1. Fully extend the actuator. Place actuator into
actuator mount with the motor to the right as
shown. Insert a 3/8 x 2 ¾" clevis pin through the
reducer bushings and the actuator and secure with
a 1/8 x 3/4" cotter pin.
2. Install two actuator link plates between the actuator
and top pivot. Attach with 3/8 x 2" clevis pins and
cotters. Center the top pivot and tighten. Connect
power wire from the extension harness to actuator
plug.
Refer to Figure 1-6

2.13 Aerator Heads Assembly

1. Retract the actuator and pivot the bar into the
transport position. Slide each aerator head assembly
into the aerator bar, place a ¾" shaft collar over the
stem and secure with a hairpin cotter. Adjust the
lower shaft collar to the bottom of the caster bar and
tighten the set screw.
20195 South Diamond Lake Road, STE 100
Rogers, MN 55374
800.966.8442
MODEL 753
Operator's Manual
Figure 1-4
Figure 1-5
Figure 1-6
12

Advertisement

Table of Contents
loading

Table of Contents