Download Print this page

harbor master Premier Verical Lift Instructions Manual page 5

Advertisement

Step 6- Cable mounting bracket
Locate the (3) cable mounting brackets.
Insert the head of (1) 3/8" x 1" carriage bolt into the outer nut channel on
upright B. Hand tighten (1) 3/8" flange nut on the carriage bolt.
Slide (1) cable mounting bracket down the upright. The cable mounting
bracket should run parallel with the side beam and is flush with top of the
upright post.
Insert (1) 3/8" x 1" carriage bolt into the outer nut channel and into the
slot on top of the cable mounting bracket.
Repeat for uprights C and D.
Step 7- V braces
Locate the (4) side frame braces. There are 3 of them that are the same
and 1 that is different. The different 1 is for the winch corner.
On the (3) similar side frame braces, line up (1) brace with the hole on
the outside of the cable mounting bracket. Secure the top of the brace
by inserting (1)1/2" x 6" bolt through the tubes. Fasten with 1/2" nut.
Fasten the bottom angle to the side frame bottom tube with (1) 3/8" x 2
3/4" bolt. Attach 3/8" flange nut and tighten.
Fasten the winch V brace to the winch with (1) 3/8" x 1" bolt and 3/8"
flange nut.
Fasten the bottom angle to the bottom side frame tube with (1) 3/8" x
2-3/4" bolt and (1) 3/8" flange nut.

Advertisement

loading