Sharp UX-370SE Service Manual page 42

Table of Contents

Advertisement

UX-370ES/SE/F
FO-780AT/ES
10
Thermal head
1
9
17
2
10
18
3
11
19
4
12
20
5
13
21
6
14
22
7
15
23
8
16
View A
8
Install the spring
on the ditch of the rib.
The head and head earth cable
pass to the core 2 times.
7
3
Rib
4
9
10
1
Parts list (Fig. 10)
No.
Part name
1
Mechanism unit
2
Screw (3×10)
3
Head cover
4
Screw (3×10)
5
Head earth cable
6
Head unit
7
Film sensor lever spring
8
Film sensor lever
9
Screw (3×10)
10
Panel lock lever spring
11
Head spring D
2
11
4
6
17
7
View A
8
9
10
Fig. 10
3 – 12
Q'ty
No.
1
12
Thermal head ass'y
1
13
Head spring E
1
14
Head spring B
2
15
Head spring F
1
16
Head cushion
1
17
Head frame
1
18
Head cable
1
19
Screw (3×6)
2
20
Head guide, right
2
21
Screw (3×6)
2
22
Head guide, left
23
Thermal head
20
19
18
12
13
14
15
16
16
4
5
Put the earth cable in parallel to the head frame.
Part name
Q'ty
1
2
2
1
2
1
1
1
1
1
1
1
23
22
21
14
13
11
Tightening torque
6.0±0.5kg.cm
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ux-370Fo-780Ux-370fFo-780atFo-780es

Table of Contents