GHP Group Dyna-Glo RMC-FA40 User Manual page 7

Propane construction heater
Table of Contents

Advertisement

PROPANE CONSTRUCTION HEATER
Assembly Components and Instructions:
Tools required for assembly:
All Models: Adjustable Wrench
FA100 & FA125 Series: Phillips
Head Screw Driver
1. Assemble the Leg:
(FA100 & FA125 Series Only)
Parts Required: Adjustable Leg
Place the heater as shown,
insert the leg into holes of
the base, then adjust
to the desired height.
2. Assemble the Height Control Screw:
(FA100 & FA125 Series Only)
Parts Required: Height Control Screw 2 pcs
Turn the Height Control Screw
FORFNZLVH WR ORFN LW 7XUQ WKH
Height Control Screw counter-
FORFNZLVH WR XQORFN LW
3. Assembling the Cord Wrap Attachments:
(FA100 & FA125 Series Only)
Parts Required:  6FUHZV 67;
and 2 Cord Wrap Attachments
Place the cord wrap attachments
as shown, then use Phillips
screwdriver to tighten the screws
and secure the cord wrap attachments.
4. Regulator and Hose Connection:
(All Models)
6HH ¿JXUH RQ ULJKW
Connect the hose tightly to
the heater using a wrench.
Please also refer to
page 8 in the manual.
Contents:
All Models: Unit, Manual, Hose and Regulator
Assembly
FA100 & FA125 Series Includes:
 &RUG :UDS $WWDFKPHQWV  6FUHZV 67[ 
Adjustable Leg, 2 Height Control Screws
1-877-475-5660
Assembly Time:
5 Minutes
/RFN FORFNZLVH
Hose Assembly
7LJKWHQ FORFNZLVH
use a wrench
1-877-475-5660
6

Advertisement

Table of Contents
loading

Table of Contents