Backplate Screw Installation; Backplate Adhesive Installation - Feit Electric PATH/SYNC/SOL/BZ/2 Use And Care Manual

Solar led pathway lights + remote
Table of Contents

Advertisement

Backplate Screw Installation

1
Installing the backplate
□ Position the backplate (EE) in the desired location. Utilize
the holes on the backplate (EE) to mark the location for
the wall anchors (FF).
3
Attaching the backplate
□ Align the backplate (EE) holes with the wall anchors (FF) and insert the screws (GG) using a Phillips screwdriver.

Backplate Adhesive Installation

Wipe down surface before installation.
For best results only install on smooth, clean surfaces.
1
Peeling off the protective film
□ Peel off the protective film from one side of the
double-sided adhesive (HH).
3
Pressing the backplate onto the surface
□ Position the backplate (EE) to the desired area. Press the backplate (EE) onto the surface and hold for 30 seconds to assure the
backplate (EE) is held securely.
EE
FF
EE
FF
HH
2
Drilling the holes
□ Use a power drill to pierce two holes in the marked
locations and insert the wall anchors (FF).
GG
2
Attaching the double-sided tape
□ Attach the double-sided adhesive (HH) to the backplate
(EE). Peel off the other side of the double-sided
adhesive (HH).
4
FF
HH
HH
EE
EE
WWW.FEIT.COM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PATH/SYNC/SOL/BZ/2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents