Finish Framing; Fl Ush - Napoleon Ascent BL42NTE Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

fi nish framing
EN
9.2
fl ush
WARNING
!
Do not build into this area - it must be left clear to provide adequate clearance for the vent in this 14"
(35.6cm) wide area centered along the front of the appliance. The appliance should be in its fi nal location
before framing.
CEILING
G
42
W415-3035 / 05.04.21
H
MINIMUM
FROM
BASE
OF
APPLIANCE
B
B
G
A
H
14"
[35.6cm]
MIN
42 1/2"
39 3/8" (100cm)
18 9/16" (47.1cm)
56" (142.2cm)
COMBUSTIBLE
HEADER
DRYWALL
A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ascent linear seriesAscent bl42pteAscent bl42

Table of Contents