Assembly; Shield Installation; Nylon Line Head Installation - Echo SRM-225 Operator's Manual

Straight shaft trimmer
Hide thumbs Also See for SRM-225:
Table of Contents

Advertisement

ASSEMBLY

ASSEMBLY

Shield Installation

(Nylon line operation)
Parts required: Debris Shield, Shield Plate, three 5 x 16 mm screws.
This unit cannot be converted for brushcutter use.
1. Place shield (A) on the bottom of the bearing housing
flange.
2. Place shield plate (B) on shield, align holes. Install three
screws from bottom through plate and shield into gear case.
3. Assemble adapter plate (C) onto PTO shaft.

Nylon Line Head Installation

Parts required: Nylon Line Head.
Wear Gloves or personal injury may result:
• Cutoff knife is sharp.
• Gearcase and surrounding area may be hot.
1. Be sure adapter plate (A) remains on PTO shaft (B).
2. Align locking hole in upper plate with notch in edge of gear
housing and insert head locking tool (C).
12
C
A
B
C
© 01/22 ECHO Incorporated
SRM-225
A
B
X7732278503

Advertisement

Table of Contents
loading

Table of Contents