1.4

Specific safety instructions

Caution
Make sure the boiler can be reached at all times.
The boiler must be installed in a frost-free area.
In the case of a fixed connection to the power cord, you must al­
ways install a main double pole switch with an opening gap of at
least 3 mm (EN 60335-1).
Drain the boiler and central heating system if you are not going
to use your home for a long time and there is a chance of frost.
The frost protection does not work if the boiler is out of opera­
tion.
The boiler protection only protects the boiler, not the system.
Check the water pressure in the system regularly. If the water
pressure is lower than 0.8 bar, the system must be topped up
(recommended water pressure between 1 and 2 bar).
Important
Keep this document near to the boiler.
Important
Casing panels may only be removed for maintenance and servic­
ing purposes. Refit all panels when maintenance work and servic­
ing are complete.
Note
Instruction and warning labels must never be removed or covered
and must be clearly legible throughout the entire service life of the
boiler. Replace damaged or illegible instruction and warning labels
immediately.
Note
The boiler must not be modified in any way.
1.4.1

Handling

General
The following advice should be adhered to, from when first handling the
boiler to the final stages of installation, and also during maintenance.
Most injuries as a result of inappropriate handling and lifting are to the
back, but all other parts of the body are vulnerable, particularly should-
ers, arms and hands. Health & Safety is the responsibility of EVERY-
ONE.
There is no "safe" limit for one person - each person has different
capabilities. The boiler should be handled and lifted by TWO PEOPLE.
Do not handle or lift unless you feel physically able.
Wear appropriate Personal Protection Equipment e.g. protective gloves,
safety footwear etc.
Preparation
Co-ordinate movements - know where, and when, you are both going.
Minimise the number of times needed to move the boiler - plan ahead.
Always ensure when handling or lifting the route is clear and unobstruc­
ted. If possible avoid steps, wet or slippery surfaces, unlit areas etc. and
take special care on ladders/into lofts.
Technique
When handling or lifting always use safe techniques - keep your back
straight, bend your knees. Don't twist - move your feet, avoid bending
forwards and sideways and keep the load as close to your body as pos­
sible.
Where possible transport the boiler using a sack truck or other suitable
trolley.