Chalmit SOLAS Installation, Operation And Maintenance Instructions

Led luminaire industrial

Advertisement

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SOLAS – LED Luminaire
Industrial
Important:
Please read these instructions carefully before installing or maintaining this equipment.
Good electrical practices should be followed at all times and this data should be used
as a guide only.
I-SOLI-01.doc
Issue 13
10/11/2021
IOM –
SOLAS - INDUSTRIAL Luminaire
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SOLAS and is the answer not in the manual?

Questions and answers

Summary of Contents for Chalmit SOLAS

  • Page 1 IOM – SOLAS - INDUSTRIAL Luminaire INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS SOLAS – LED Luminaire Industrial Important: Please read these instructions carefully before installing or maintaining this equipment. Good electrical practices should be followed at all times and this data should be used as a guide only.
  • Page 2 Introduction – SOLAS Luminaire The Solas is designed to be used from mains voltage and as a maintained or non-maintained emergency light. The emergency duration is for 90 minutes on full power or 180 minutes on half power. Situations where an area needs to be lit for escape purposes (life boat stations) 90 minute full power would be used.
  • Page 3 IOM – SOLAS - INDUSTRIAL Luminaire Tools 5mm A/F socket keys. 4mm flat blade screwdriver. 19mm A/F spanners.Suitable spanners for installation of cable glands. Pliers, knife, wire strippers/cutters. Electrical Supplies The charging system will accept rated voltages of 220 to 254V or for alternative version 100 to 130V, 50 or 60Hz.
  • Page 4 LED replacement. If it is necessary to replace the LED’s, all the LED’s will be replaced as an assembly mounted on an aluminium back plate. The full assembly supplied by Chalmit Lighting. The area should be gas free, (this is because there are un-assessed electronic components in the unit and these could retain stored energy).
  • Page 5 IOM – SOLAS - INDUSTRIAL Luminaire The terminal chamber should be opened periodically and checked for moisture ingress. The cable connections should be checked for tightness. The gasket should be checked for lack of elasticity and if necessary replaced and bonded into groove (it may well be practical to replace the gasket on each occasion if this is 2-3 year interval).
  • Page 6 IOM – SOLAS - INDUSTRIAL Luminaire Disposal of Material The units are chiefly made of incombustible material. The control gear contains electronic components and synthetic resin. All these may give off noxious fumes if incinerated. Care must be taken to render these fumes harmless and avoid inhalation.
  • Page 7 RoHS II Directive Regulations 2012 On behalf of the Chalmit, I declare that, on the date the equipment accompanied by this declaration is placed on the market, the equipment conforms to all technical and regulatory requirements of the above listed directives.

Table of Contents