Huawei SUN2000-200KTL-H2 Quick Manual page 19

Hide thumbs Also See for SUN2000-200KTL-H2:
Table of Contents

Advertisement

Installing a DC Input Power Cable
Positive metal contact
Negative metal contact
Click
Connector connection:
Installing the RS485 Communications Cable
4.10
When routing communications cables,
separate communications cables from
power cables to prevent communication
from being affected.
PV-CZM-41100
(STAUBLI)
Ensure that the cable
cannot be removed
after crimped.
Use a multimeter
to measure the
DC voltage. (DC
voltage: ≤ 1500 V)
Communication Port Pin Definition
18
Positive connector
Negative
Click
connector
Ensure that
the locking
nut is
secured.
13001462
(STAUBLI)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-196ktl-h0Sun2000-215ktl-h0Sun2000-215ktl-hv

Table of Contents