Huawei SUN2000-200KTL-H2 Quick Manual

Huawei SUN2000-200KTL-H2 Quick Manual

Hide thumbs Also See for SUN2000-200KTL-H2:

Advertisement

Quick Links

SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0)
Quick Guide
Issue: 15
Part Number: 31500CPW
Date: 2022-05-10
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SUN2000-200KTL-H2

  • Page 1 SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0) Quick Guide Issue: 15 Part Number: 31500CPW Date: 2022-05-10 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Product Overview

    • Before installing the device, read the user manual carefully to get familiar with product information and safety precautions. Huawei shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Page 3 (1) DC input terminals (controlled by DC SWITCH 1) (2) DC switch 1 (DC SWITCH 1) (3) DC input terminals (controlled by DC SWITCH 2) (4) DC switch 2 (DC SWITCH 2) (5) DC input terminals (controlled by DC SWITCH 3) (6) DC switch 3 (DC SWITCH 3) (7) Ventilation valve (8) USB port (USB)
  • Page 4: Installation Requirements

    SUN2000 Dimensions Mounting Bracket Dimensions Installation Requirements If inverters are installed in a place with abundant vegetation, in addition to routine weeding, harden the ground underneath the inverters using cement or gravel (recommended area: 3 m x 2.5 m).
  • Page 5: Installing The Sun2000

    Installation Angle Installation Space The clearance at the bottom must meet the requirements on the bending radius of the AC output power cable. Installing the SUN2000 • The M12x40 bolt assemblies are delivered with the SUN2000 (bound to the mounting bracket). If the bolt assembly length does not meet the installation requirements, prepare M12 bolt assemblies by yourself and use them...
  • Page 6 1. Install the mounting bracket. 2. Unpack the inverter and move it to the specified position. Handles are packed in a fitting bag and are not delivered with the SUN2000.
  • Page 7 3. Adjust the installation positions of the handles, and install the SUN2000 on the mounting bracket.
  • Page 8: Installing Cables

    Installing Cables Installation Preparations If outdoor copper-core cables are used, select copper wiring terminals. For details about the requirements for cables and terminals of other materials, see the user manual. Item Type Specifications Description PE cable Single-core Conductor cross- • If you choose the outdoor copper sectional area ≥...
  • Page 9 Item Type Specifications Description RS485 Outdoor shielded • Conductor cross- When three communication twisted pair cable sectional area: 0.25–1 communications cables s cable connect to the signal • Cable outer diameter: cable connector, the 4–11 mm outer diameter of the cables should be 4–8 (Optional) Three-core outdoor...
  • Page 10 Installing the PE Cable • It is recommended that the PE cable be connected to a nearby PE point. Connect the PE points of all SUN2000s in the same PV array to ensure equipotential connections to PE cables. • To enhance the corrosion resistance of a ground terminal, you are advised to apply silica gel or paint on it after connecting the PE cable.
  • Page 11 3. Remove the crimping modules that are bound in the maintenance compartment and save them properly for future use. For some models, a three-hole rubber plug is bound in the maintenance compartment. After removing the rubber plug, save it properly for future use. Crimping module (Optional) Replacing the Crimping Module...
  • Page 12 Removing the Rubber Rings from the Crimping Module Use scissors to cut off the joints of the rubber rings to remove them. All rubber rings are removed in the same way. (Optional) Installing the Solar Tracker Power Cable 1. A switch-disconnector-fuse or fuse-switch-disconnector with a voltage of no less than 800 V, current of 16 A, and protection type of gM needs to be installed between the SUN2000 and the tracker controller for protection.
  • Page 13 • Remove the corresponding rubber rings in strict accordance with the cable diameter, and ensure that the crimping module is not damaged. Otherwise the protection level of the solar inverter will be affected. • Ensure that AC terminations provide firm and solid electrical connections. Failing to do so may cause SUN2000 malfunction and damage to its terminal block, even starting thermal events.
  • Page 14 Single-core Cable The 32–36 mm cable is supported only (five rings) by some models. Refer to the (four rings) corresponding label to get the (three rings) supported size. (two rings) (one ring) Bending Radius Multi-Core Cable Single-Core Cable Unarmored Armored Unarmored Armored R ≥...
  • Page 15 Closing the Maintenance Compartment Door Installing DC Input Power Cables Wiring Description of Y-branch Connectors Y-branch connectors can be purchased from Huawei or the manufacturers based on the • following recommended models: If the rated current of the fuse of the Y-branch connector is 15 A, the recommended model is 904095944 (Luxshare) or A040959443039 (Comlink);...
  • Page 16 Number Number of of Y- Recommended MPPT to Be Y-branch Recommended MPPT to Be branch Connected Connector Connected Connector Sets Sets MPPT1 MPPT1 and MPPT4 MPPT1, MPPT3 and MPPT4 MPPT1, MPPT3, MPPT4 and MPPT6 MPPT1, MPPT2, MPPT3, MPPT4, MPPT1, MPPT2, MPPT3, MPPT4, and MPPT5 MPPT5, and MPPT6 MPPT1, MPPT2, MPPT3, MPPT4,...
  • Page 17 B to the SUN2000s. (recommended) Models recommended Part A can be directly connected to the SUN2000, by Huawei and part B is not needed. Connecting Y- To ensure that the terminals of part A match the DC...
  • Page 18 Selecting DC Input Terminals The SUN2000 has three DC switches (DC SWITCH 1, DC SWITCH 2, and DC SWITCH 3). DC SWITCH 1 controls routes 1–6 of DC input terminals, DC SWITCH 2 routes 7–12, and DC SWITCH 3 routes 13–18. Select DC input terminals according to the following rules: 1.
  • Page 19 Installing a DC Input Power Cable Positive metal contact Positive connector PV-CZM-41100 Negative (STAUBLI) Click Negative metal contact connector Ensure that the cable cannot be removed after crimped. Use a multimeter Ensure that to measure the the locking Click DC voltage. (DC nut is voltage: ≤...
  • Page 20 Port Definition Definition Description RS485A IN, RS485 RS485A OUT, RS485 Used for cascading differential signal+ differential signal+ inverters or connecting to RS485-1 devices such as the RS485B, RS485 RS485B, RS485 SmartLogger. differential signal– differential signal– PE, shielding ground 6 PE, shielding ground RS485A, RS485 RS485B, RS485 Used for connecting to...
  • Page 21: Verifying The Installation

    Connecting Communications Cables (4–8 mm Two-Hole Rubber Plug) If three communications cables are to be connected, use the three-hole rubber plug that is bound in the maintenance compartment. Verifying the Installation 1. The SUN2000 is installed correctly and securely. 2. The DC switches and downstream AC switch are OFF. 3.
  • Page 22: Powering On The System

    Powering On the System When LED2 is steady green (meaning that the inverter is grid-tied), do not turn on any DC switch. Otherwise, the inverter may be damaged because the insulation resistance is not detected. Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter •...
  • Page 23 The app is named SUN2000. 2. Go to Huawei app store (https://appstore.huawei.com), search for SUN2000, and download the app installation package. You can also scan Scan the QR the QR code (https://appgallery.cloud.huawei.com/appdl/C10279542) to...
  • Page 24 Login Page Select Connection Mode Select User Quick Settings Function Menu • The screenshots in this document correspond to app version 3.2.00.013 (this app is available only on Android phones currently). • When the WLAN connection is used, the initial name of the WLAN WLAN module SN hotspot is Adapter- , and the initial password is...
  • Page 25: Customer Service Contact

    Customer Service Contact Region Country Phone Service Support Email France Germany Spain eu_inverter_support@huawei.com 0080033888888 Europe Italy Netherlands Other countries For details, see solar.huawei.com. Australia eu_inverter_support@huawei.com 1800046639 Turkey eu_inverter_support@huawei.com 0080021686868 Malaysia /1800220036 (+66) 26542662 (charged apsupport@huawei.com Asia Pacific by local call) Thailand...
  • Page 26 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang, Shenzhen 518129, People's Republic of China solar.huawei.com...

This manual is also suitable for:

Sun2000-196ktl-h0Sun2000-215ktl-h0Sun2000-215ktl-hv

Table of Contents