mabe serviplus SEDNA ESTILO Service Manual page 18

Table of Contents

Advertisement

When applying voltage to the white and black cables the board is energized and 10 seconds later it sends a signal to the
compressor to start working. You must now bridge test points GND and P.P., which will turn off the compressor. Three
seconds later, a signal will be sent to the defrost resistance to start working and, at this moment, the white and blue
cables must give a reading of 127 A.C.V.
NOTE: If the freezer sensor is connected and does not record the temperature, the board will not send the signal to the
heater to initiate the defrost cycle.
18

Advertisement

Table of Contents
loading

Table of Contents