Download Print this page

Advertisement

Quick Links

Materials
Top/Bottom Panel
Place Bottom panel to begin the build
process, making sure the slats are facing
upward.
Once all Mid Panels are placed, complete the
Fold build by placing the Top Panel with the
slats facing down.
FOLD
Mid Panel
Place Mid panels on top of Bottom panel,
making sure the slights are aligned and slide
into each other.
www.loftwall.com

Advertisement

loading

Summary of Contents for LOFTWALL FOLD

  • Page 1 Once all Mid Panels are placed, complete the Fold build by placing the Top Panel with the slats facing down. www.loftwall.com...
  • Page 2 Place Mid panels on top of Bottom panel, Once all Mid Panels are placed, complete the process, making sure the slats are facing making sure the slights are aligned and slide Fold build by placing the Top Panel with the upward. into each other. slats facing down.