Hitachi ZAXIS 135US-6 class Operator's Manual page 516

Hydraulic excavator
Table of Contents

Advertisement

HYDRAULIC BREAKER, HYDRAULIC CRUSHER AND QUICK COUPLER
Raising the Front Part of the Undercarriage by Pressing
Down the Breaker May Cause Damage to the Front
Attachment
Never raise the front edge of the undercarriage higher than
150 mm by pressing the breaker down.
Machine storing position with breaker
After operating the machine, be sure to place the breaker
horizontally on the ground. Do not leave cylinders at their
stroke end position. Failure to do so may damage the
cylinder.
OPTIONAL ATTACHMENTS AND DEVICES
Pressing
Raising
Down
100 to 150 mm
Place horizontally
13-26
Do not leave cylinders at their stroke end
position.
M147-05-016
MJAD-05-001

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 225us-6 classZaxis 345us-6 classZaxis 135us-6Zaxis 225uslc-6Zaxis 345uslc-6

Table of Contents