Lennox CBX40UHV Series Unit Information page 53

Hide thumbs Also See for CBX40UHV Series:
Table of Contents

Advertisement

D−ECB40−12.5CB, -15CB − 208/230V SINGLE PHASE − SEQUENCE OF OPERATION
FIRST−STAGE HEAT
1. W1 of the thermostat provides a W1 demand to the AHC. The AHC outputs a 22VDC signal to the K32 relay. K32−1 closes.
2. Assuming the N.C. primary (S15) and secondary (S20) limit switches are closed, electric heat element HE1 is energized.
3. When K33-1 and K34−1 close, assuming the N.C. primary (S15) and secondary (S20) limit switches are closed,
electric heat elements HE2 and HE3 are energized.
SECOND−STAGE HEAT (remove jumper between W2 and R)
4. When K32-1 closes, the unit is ready for a second stage heat demand. W2 of the thermostat provides a W2 demand
to the AHC. The AHC outputs a 22VDC signal to the K33 and K34 relays.
CBX40UHV
1
1
4
2
4
Page 53
3
3

Advertisement

Table of Contents
loading

Table of Contents