Lennox CBX40UHV Series Unit Information page 51

Hide thumbs Also See for CBX40UHV Series:
Table of Contents

Advertisement

C−ECB40-8 AND ECB40−8CB − 208/230V SINGLE PHASE − SEQUENCE OF OPERATION
FIRST−STAGE HEAT
1. W1 of the thermostat provides a W1 demand to the AHC. The AHC outputs a 22VDC signal to the K32 relay. K32−1 closes.
2. Assuming the N.C. primary (S15) and secondary (S20) limit switches are closed, electric heat element HE1 is energized.
SECOND−STAGE HEAT (remove jumper between W2 and R)
3. When K32-1 closes, the unit is ready for a second stage heat demand. W2 of the thermostat provides a W2 demand
to the AHC. The AHC outputs a 22VDC signal to the K33 relay.
4. When K33-1 closes, assuming the N.C. primary (S15) and secondary (S20) limit switches are closed, electric heat
element HE2 is energized.
CBX40UHV
1
3
1
4
4
2
Page 51

Advertisement

Table of Contents
loading

Table of Contents