General guidance
These instructions are provided as a guide to help you
install your equipment. Depending on the type of ground
conditions it may be necessary to modify the installation. If
you are unsure, please consult a qualified professional or
contact the Garden Gym Team. The installation should be
carried out by 2 people. Before digging you must ensure
that there is no risk of encountering services such as drains
or electricity.
The Garden Gym does not accept any liability in relation
to the installation and subsequent use of the gym
relating to incorrect or improper installation.
You will need
Spade / hole diggers / safety gloves / step ladder / tape /
measure / level / 2 x 19mm socket drivers / hammer
Post mix
Between 1 and 2 bags per post, depending on
the size of your holes and ground conditions

Advertisement

loading
Need help?

Need help?

Do you have a question about the Pull up bar and is the answer not in the manual?

Questions and answers

Summary of Contents for The Garden Gym Pull up bar

  • Page 1 2 people. Before digging you must ensure that there is no risk of encountering services such as drains or electricity. The Garden Gym does not accept any liability in relation to the installation and subsequent use of the gym relating to incorrect or improper installation.
  • Page 2 Select location and mark out Digging the holes Your Pull up bar should be installed in a level area of soft ground or Digging the holes for the posts is a key part of the installation. lawn. Please ensure that there is no risk of disturbing underground The hole must be a minimum of 600mm deep (700mm for 3.6m...
  • Page 3 Insert the second post and align Insert the second post into the second hole. Using the position of the pull up bar you will need to adjust the height of the post to find Insert the pull up bar the correct alignment. This is achieved by either removing more Ensuring the post has set in the concrete you will now use soil from the hole or backfilling the hole slightly.
  • Page 4 Final steps with a tanalised finish and 10 year life expectancy. It is essential to Check the second post and the pull up bar to ensure that check the bolts and fixings on a monthly basis and tighten where everything is level. You can add some dry post mix to the hole necessary as they can loosen off as the timber goes through the to help get everything perfectly aligned.