Charge Led - opti-solar SC Series Installation And Operation Manual

Lighting control
Table of Contents

Advertisement

2-3 Adjustability of Load Control
When setting in the load control mode, DIP Switch 7 should be placed at OFF. The LVD
(low voltage disconnect) and LVR (low voltage reconnect) are important setpoints to
protect the system battery from deep discharges that could damage the battery.
The Procedure of LVD/LVR Selection
Step 1: Press MANUAL EQU/LVR push button and LIGHT TEST push button at the
same time until the CHARGE LED turns red and LOAD LED turns green in
turns.
Step 2: Press LIGHT TEST push button at one time and observe the CHARGE LED
color and LOAD LED color changing in the following order to select the LVD
and LVR level.

CHARGE LED

Red
Red
Green
Green
Green
Orange
Orange
Orange
Step 3: Press MANUAL EQU/LVR to finish the LVD/LVR level setting procedure.
Inductive Loads (Motors)
For dc motors and other inductive loads, it is strongly recommended to install a diode
near the controller. Inductive loads can generate large voltage spikes that might damage
the controller's lightning protection devices.
The diode should be installed near the controller, and in the orientation shown in the
diagram below:
SC Lighting Control Series
LOAD LED
Voltage System
Red
Green
Red
Green
Orange
Green
Orange
Red
LVR
12V
24V
12.6
25.2
12.8
25.6
13.0
26.0
13.2
26.4
13.4
26.8
13.6
27.2
13.8
27.6
12.0
24.0
D
o i
e d
P
o r
e t
i t c
n o
17
LVD
48V
12V
24V
50.4
11.1
22.2
51.2
11.3
22.6
52.0
11.5
23.0
52.8
11.7
23.4
53.6
11.9
23.8
54.4
12.1
24.2
55.2
12.3
24.6
48.0
10.5
21.0
48V
44.4
45.2
46.0
46.8
47.6
48.4
49.2
42.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc-10lcSc-20lcSc-30lc

Table of Contents