Visually inspect the wiring, terminals and all other components for any sign of discolouration,
arcing or charring.

Maintenance Schedule

The unit should be checked at the intervals detailed below to ensure the lifetime of the
product is maximized and the efficiency isn't impacted detrimentally. The intervals
suggested below are based on a normal environment and the unit should be checked
frequently initially to ensure the recommendations are sufficient.
Failure to adhere to the below will reduce performance in the first instance and may impact the
products warranty.
Filters
Coil
Fan
Condensate
Tray
Controls &
Wiring
Example – Wiring Diagram
Every 3 Months
Yes
Check for blown fuses. If a fuse is blown
check the circuits and components it protects
thoroughly before re energising. Any blown
fuse must be replaced with an equivalent
fuse of the same specification, size and
rating.
Example - controls enclosure internal wiring
Every 6 Months
Yes
Yes
Yes
Page 14
Every 12 Months
Yes